Waterproofing
Roof with bituminous membrane
- Location
- Las Brisas de Santo Domingo, Santo Domingo
- Date
- June 2025
- Duration
- 15 days
- Area
- 65 m²
We built a reinforced steel structure and lined the ceiling with gypsum board. The roof deck was then primed and the bituminous membrane torch-applied, with heat-welded laps.
Materials
Structural Metalcom · Steel sections · Plywood · Mineral-surfaced bituminous membrane, 4.5 kg/m² · Gypsum board (Volcanita) · Paints
Have a similar project?
Tell us what you want to do and where. Before we quote, we visit the site: once we have seen the conditions, we send you a price that holds.
Request a site visit





